IKING GROUP-INSULATION AND ACOUSTIC SOLUTION FOCUS
The Onshore Gas Development Phase III (OGD-III) Project was designed to process condensate rich gas at Habshan and to produce NGL and condensate. Residue gas is re-injected back into the reservoir for pressure maintenance purposes (gas cycling).
Industry Sector:Oil & Gas; Industrial
Service Area:Pipe fire insulation
Supply Production :
ISOKING® Rock Wool Blanket With Wire Mesh(WM) :650 Tons
ISOKING® Rock Wool Pipes (PS):1700m3