IKING GROUP-INSULATION AND ACOUSTIC SOLUTION FOCUS
As a landmark energy infrastructure project in North Africa, the 1200 MW Combined Cycle Power Plant in Algeria required high-performance thermal and fire insulation solutions capable of withstanding extreme operational temperatures and high-vibration conditions.
ISOKING® supplied over 890 tons of engineered mineral wool materials and 1,500 m³ of pre-formed pipe sections. Our solutions ensured minimal heat loss, enhanced personnel safety, and long-term structural durability across all primary gas turbine, steam piping, and auxiliary systems.
| Product Line | Supplied Quantity | Primary Application & Engineering Advantages |
|---|---|---|
| ISOKING® Mineral Wool Blanket with Wire Mesh (WM) | 570 Tons | Flexible, high-tensile insulation featuring galvanized wire mesh backing. Ideal for large-diameter steam pipelines and high-vibration exhaust ducts. |
| ISOKING® Mineral Wool Board | 320 Tons | High-density compressive boards engineered for HRSG (Heat Recovery Steam Generator) walls, boiler casing, and flat equipment surfaces. |
| ISOKING® Mineral Wool Pipe Section (PS) | 1,500 m³ | Precision pre-formed cylindrical insulation providing seamless fitting, low thermal conductivity, and superior acoustic damping on hot utility pipes. |
Combined cycle systems generate high thermal loads. ISOKING® mineral wool maintains structural integrity and low thermal conductivity at temperatures up to 650°C.
Wire mesh reinforcement prevents sagging, fiber migration, and physical breakdown during long-term operational vibration.
Full batch production, rigorous factory testing, and humidity-protected export packaging were executed seamlessly to align with the EPC contractor’s strict construction milestones.
Planning a thermal power plant, oil refinery, or industrial piping insulation project? Contact our engineering team for technical specifications, thermal calculation reports, and factory-direct pricing.