Home Project International Project 451 MW Combined-Cycle Power Plant In Khuzestan Iran

International Project

451 MW Combined-Cycle Power Plant In Khuzestan Iran

451 MW Combined-Cycle Power Plant In Khuzestan Iran

Application Material: 

ISOKING® Mineral Wool Blanket With Wire Mats(WM), Mineral Wool Pipes(PS),Mineral Woo Board.

451-megawatt combined-cycle power plant build at Andimeshk Khuzestan Iran 

 

Industry Sector:Oil & Gas; Industrial

Service Area:Pipe fire insulation

Supply Production :

ISOKING®  Mineral Wool Pipes (PS) Total 1800m3

ISOKING®  Mineral Wool Board  Total 350Tons 

ISOKING®  Mineral Wool Blanket With Wire Mesh  (WM) Total : 620 Tons 